Four Oaks Apartments Case Study

We are proud to release the case study for the Four oaks apartments. This is a stick-built Loadbearing steel frame 4th-floor extension. Sporting a superb hybrid Steel frame colonnade structure all cladded with a lightweight brick slip system and aluminium PPC planking system by OP Systems ltd.

All structure design & engineering for the project was undertaken by Design Engine Ltd.

All cladding designed by Dave Kirby of DDK Design and supplied by OP Systems Ltd

The project was installed in partnership by John Craig of Complete Ceilings who managed and delivered this project in record time!!

Well done on successfully completing this challenging project in less than a 4 month period from initial design discussions to the completed building delivery.

four-oaks-ops

Project for LGG

Check our the 4 storeys stick-built load-bearing steel frame structures used to build this latest project for LGG Projects.

This is one of the latest additions of student accommodation blocks built for Lincoln University. It was delivered during the first lockdown in 2020. Working with Stem Architects, LGG Projects and Jackson & Jackson Developments to design and supply the loadbearing structural steel frame and structural steel staircases.

All engineering and design were undertaken by Design Engine Ltd of Halesowen providing another fantastic structural solution to a challenging project.

Special mention goes out to Lee Harker of Keyfix Ltd who’s a dedicated team of installers did a fantastic job of installing and managing the steel frame and brick slip cladding on the project.

Project for Lincoln University

Here we have some new Student Accommodation blocks for Lincoln University at 179 High Street, Lincoln Project. With HKL Specialists Ltd, CCP Ltd, Design Engine Ltd and Stem Architects. We partnered to provide over 4000m2 of SFS, Kroc insulation, Helping hand support system. All finished with an A2 rated pre-coat Aluminium Facade panel and brickwork.

Although the project was challenging to all due to the change in Main contractor Mid project, I think you will agree it doesn’t look half bad!

Well done to Ryan and Terry at HKL for all their hard work on the installation and to John Craig of CCP Ltd for the installation of our SFS Framing system to the project.